ming-yuan-cho

Ming-Yuan Cho Professor

Power engineering
Ext
15530、15565、15591、15596、15597、15598
Lab
iangong Campus-department of electrical engineering 607
Email
mycho@mail.ee.nkust.edu.tw

Power Optimization

Smart Grid/Micro Grid

Energy Information/Communication Technology

Renewable Energy Technology

Sun-Yat-Sen University, Republic of China, Institute of Electrical Engineering, Power Group, Ph.D. 1989/9 to 1992/7

Sun Yat-sen University, Republic of China, Institute of Electrical Engineering, Master, 1987/9 to 1989/6

Kaohsiung Institute of Technology, Republic of China, Electrical Engineering, Diploma, 1977/9 to 1982/6

Distinguished Professor and Dean of the College of Electric and Information, National Kaohsiung University of Applied Sciences, 2014/8 ~ 2017/7
Professor, Department of Electrical Engineering, and Dean, R&D Affair, National Kaohsiung University of Applied Sciences, 2012/8 ~ 2013/7
Professor, Department of Electrical Engineering, and Dean, Continuous and Extension Education, National Kaohsiung University of Applied Sciences, 2004/8 ~ 2009/7
Professor and Head of Department of Electrical Engineering, National Kaohsiung University of Applied Sciences 2000/8 ~ 2003/7
Professor, Department of Electrical Engineering and Director of Energy Technology Research Center, National Kaohsiung University of Applied Sciences 2009/8 ~ 2018/2
Professor, National Kaohsiung University of Applied Sciences, Department of Electrical Engineering, Director of Electrical Energy Research Center, 1998/ 2 to 2000/7
Associate Professor, and Electrical Engineering, National Kaohsiung Institute of Technology, 1992/ 8 to 1998/2
Division Lecturer, Department of Electrical Engineering, College of Kunshan Industrial and Business School, 1989/ 8 to 1990/7
 Electrical Engineer, General Factory Electrical Design Division, Chinese Petroleum Kaohsiung Refinery, 1986/ 8 to 1987/8
Technical Service Representative, Commercial Systems Division, Taiwan International Standard Electronics Corporation 1984/ 9 to 1986/3
Project name Work within the project Year to date Subsidy or agency Funding (Million)
Research on Protection of User Equipment Burning Due to Abnormal Voltage of Distribution Line host 102/1-103/12 Taiwan Power Company 488
Smart electric vehicle charging / changing battery system control center host 102/7-103/12 Bureau of Energy,Ministry of Economic Affairs 900
Research and development of key technologies for permanent magnet vacuum circuit breaker host 102/7-103/6 TAIWAN CALSONIC 120
Electric vehicle battery measurement technology and implementation host 102/9-103/8 CPC Corporation, Taiwan 78.7
Wire theft and illegal electricity integration system host 102/12-104/11 Taiwan Power Company 605
WEB BASED Optimal Contract Capacity Maintenance (6) host 102/12-103/11 Taiwan Power Company 73
Cause Analysis and Improvement of Low Voltage Street Light Switch Failure researcher 102/8-103/12 Taiwan Power Company 245
Design and development of user energy controller with automatic demand response protocol host 103/7-104/6 Southern Taiwan Science Park 174.2
Investigation and Analysis of Various Power Load Characteristics under AMI Architecture host 103/9-105/8 Taiwan Power Company 1110
Research on Multi-party Demand Trading Mechanism host 103/3-104/12 Institute for Information Industry 60
Kaohsiung City Smart Power Saving Project host 104/8~105/8 Economic Development Bureau,Kaohsiung City Government 6600
Wisdom meter reading system last line reading information open user measurement added value application integration technology development - the second national energy plan host 105/1~105/12 Ministry of Science and Technology 820.44
Power engineering industry technicians online training system planning and construction development plan host 105/04~105/12 Institute for Information Industry 315
Taichung City Power Saving Strategy Construction and Promotion Demonstration Subsidy Program host 105/07~105/12 Economic Development Bureau,Taichung City Government 298.8
Electric Power Research and Renewable Energy and Energy Conservation Research Report host 105/12~106/01 Institute for Information Industry 52.9
The last road of advanced meter reading infrastructure links user-side value-added application integration technology development - the second phase of the national energy plan host 106/01~106/12 Ministry of Science and Technology 920
Maintenance of power engineering industry technicians online training course system and electricity safety cherished home website and training of household electricity safety clinic volunteers part of the work commissioned service case host 106/03~106/11 Institute for Information Industry 29
In the 106th year, "SOUTHERN TAIWAN SCIENCE PARK Smart Manufacturing Industry Settlement Service Platform Promotion Plan" host 106/03-107/03 Southern Taiwan Science Park Administration 794
106 annual energy-saving promotion plan for small and medium-sized enterprises in the industry host 106/04-106/12 Taiwan Green Productivity Foundation 86
The 106-year-old Taichung City Renewable Energy Strategy Construction and Promotion Entrusted Professional Service Case host 106/06-106/12 Taichung City Government 194
AMI_B route 1000 household construction demonstration study host 106/07-107/12 Industrial Technology Research Institute 417
Established a key technology development and self-created satellite base for UAVs at Kaohsiung University of Applied Sciences host 107/01-107/11 Southern Taiwan Science Park Administration 1200
107 annual energy-saving promotion plan for small and medium-sized enterprises in the industry Co-host 107/01-107/12 Taiwan Green Productivity Foundation 72
In the 107th year, "SOUTHERN TAIWAN SCIENCE PARK Smart Manufacturing Industry Settlement Service Platform Promotion Plan" host 107/03-108/02 Southern Taiwan Science Park Administration 800
Research on cost-benefit evaluation of 200,000 low-voltage AMI host 107/09-109/9 Taiwan Power Company 410
Integrated application research of Smart Green Community and Home Energy Management System (HEMS) (taking Singda Power Plant Dormitory Area as an example) host 107/12-108/11 Taiwan Power Company 785.6

<期刊發表>

   

  • Chen C.S., Cho M.Y., 1992, "Determination of Critical Swithches in Distribution System", IEEE Trans. on Power Delivery, Vol. 7, No. 3, pp. 1441-1449. (SCI)
  • Cho M.Y., Chen C.S., Lin W.M., 1992, "Design of Distribution Database with Customer Daily Load Pattern", Electric Power Systems Research, Vol. 23, No. 2, pp. 147-154. (SCI)
  • Chen C.S., Cho M.Y., 1993, "Energy Loss Reduction By Critical Switches", IEEE Trans. on Power Delivery, Vol. 8, No. 3, pp. 1246-1253. (SCI)
  • Chen C.S., Hwang J.C., Cho M.Y., Chen Y.W., 1994, "Development of Simplified Loss Models for Distribution System Analysis", IEEE Trans. on Power Delivery, Vol. 9, No. 3, pp. 1545-1551. (SCI)
  • Lee T.E., Cho M.Y., Chen C.S., 1994, "Distribution Systems Reconfiguration to Reduce Resistive Losses", Electric Power Systems Research, Vol. 30, No. 2, pp. 25-33. (SCI)

計畫編號:NSC 82-0404-E-151-024.  

  • Hsu C.T., Tzeng Y.M., Chen C.S., Cho, M.Y., "Simplified Feeder Loss Models By Using Artificial Neural Network", Electric Power Systems Research Vol. 34, No. 2, 1995, pp.85-90. (SCI)
  • Chen C.S., Hwang J.C., Y.M. Tzeng, Cho M.Y., "Determination of Customer Load Survey System", 1995 IEEE SM 370-7-PWRD. (SCI)
  • 陳朝順,曾燕明,曾本立,卓明遠,吳兆祥,October, 1995, “配電饋線虛功率控制與實用饋線損失之分析”, 台電工程月刊,Vol. 566, pp. 1-17.
  • Chen C.S., Tzeng Y.M., Cho M.Y., 1996, “The Application of Artificial Neural Network to Distribution Substation Load Forecasting and Temperature Sensitivity Analysis,” .Journal of the Chinese Institute of Engineers, Vol. 19, No. 2, pp. 171-177.
  • Cho, M. Y., Chen, Y. W., 1997, “Fixed/Switched Type Shunt Capacitors Planning of Distribution Systems By Considering Customer Load Patterns and Simplified Feeder Model,” Journal of IEE Proceedings- Generation, Transmission, and Distribution, Vol. 144, No. 6, pp.
  • 卓明遠, 溫孟川, 1999, “電力監控技術於電能管理之應用”,Journal of Electrical Engineers, Vol.11, No.6, pp.46~61.
  • 卓明遠, 葛世偉, 電力監控實驗式設計與建立,高雄科學技術學院學報,第27期,pp.65~78,Dec. 1997.
  • 卓明遠,藍榮進,陳建男,張謙信,, 2000, “需量預約服務控制系統設計與研製”, 台電工程月
  • 卓明遠,藍榮進,陳建男,彭士開,黃佳文,, “需量預約服務控制系統性能改善與示範研究”, 台電工程月刊,Vol. 666, pp. 45-72,Feb. 2004.
  • 卓明遠,黃鐘慶,藍榮進,葛世偉,黃佳文, 楊新全, “特高壓用戶電能管理與服務系統建構研究”, 台電工程月刊,Vol. 680, pp. 58-76,Apr. 2005.
  • 卓明遠,李鴻仁,藍榮進,趙鴻仁,黃佳文, 楊新全, “WEB BASED 高低壓用戶最適契約容量分析與管理軟體設計”, 台電工程月刊,Vol. 687, pp. 70-90,Nov. 2005.
  • 卓明遠,黃鐘慶,藍榮進,林建廷,黃佳文, 楊新全,2005, “用戶服務資料倉儲設計與規劃研究”, 台電工程月刊.
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh, Pei-Ju Chao and Huai-Yang Chang. "Precise Segmentation Rendering for Medical Images Based on Maximum Entropy Processing", Lecture Notes in Computer Science, vol.3683, Springer-Verlag, 2005, pp.366-373. (SCI impact factor: 0.513). (SCI impact factor: 0.513)
  • Ming-Yuan Cho, Tsair-Fwu Lee, Hong-Jen Lee."An Embedded Methodology for FPGAs’ Digital Distance Relay Design and Analysis ", has been accepted and will be published in IEEE Circuit and System Proceedings 2006. (SCI)
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh and Fu-Min Fang."Particle Swarm Optimization-Based SVM Application: Power Transformers Incipient Fault Syndrome Diagnosis ", has been accepted and will be published in IEEE Circuit and System Proceedings 2006. (SCI)
  • Tsair-Fwu Lee, Ming-Yuan Cho, Fu-Min Fang. "Features Selection of SVM and ANN Using Particle Swarm Optimization for Power Transformers Incipient Fault Symptom Diagnosis", has been accepted and will be published in the International Journal of Computational Intelligence Research (IJCIR), 2006. (SCI)
  • Ming-Yuan Cho, Tsair-Fwu Lee, Fu-Min Fang, Chin-Shiuh Shieh, Hong-Jen Lee."Particle Swarm Optimization-Based SVM/ANN for Incipient Faults Classification of Power Transformers", has been accepted and will be published in the Lecture Notes in Computer Science, vol.4203, Springer-Verlag, 2006 (SCI impact factor: 0.513).
  • Tsair-Fwu Lee, Ming-Yuan Cho, Hong-Jen Lee, Chao-Ji Chou, Fu-Min Fang. "Diagnosis of Incipient Faults of Power Transformers Using SVM with Clonal Selection Algorithms Optimization", has been accepted and will be published in the Lecture Notes in Computer Science, vol.4203, Springer-Verlag, 2006 (SCI impact factor: 0.513).
  • Ming-Yuan Cho, Tsair-Fwu Lee, Shih-Wei Kau, etc. "Power Transformer Fault Diagnosis Using Support Vector Machines and Artificial Neural Networks with Clonal Selection Algorithms Optimization", has been accepted and will be published in the Lecture Notes in Computer Science, Springer-Verlag, 2006, (SCI impact factor: 0.513).
  • 卓明遠、許明峰、蔡惠如,”小型配光曲線量測實驗室建立與應用分析”,照明學刊,Vol. 23,No.4,pp.31-40,Sep., 2006。
  • 卓明遠、藍榮進、顧家勇、林三福、蕭秉中,”路燈照明自動化監測管理系統”,照明學刊,Vol. 23,No.4,pp.22-30,Dec., 2006。
  • T.F. Lee, H. Y. Wu, Y.C. Hsiau, T.L. Huang, M.Y. Cho, “Optimization of Reactive Power Compensation and Voltage Regulation Using Artificial Immune Algorithm for Radial Transmission Networks”, Engineering Intelligent Systems, Vol.15, No.2, June 2007, pp.107-113.
  • 卓明遠,藍榮進,簡志清,黃佳文,陳裕清,蘇德勝, “低壓用戶違章用電監測系統設計與建置”, 台電工程月刊,Vol. 707, pp. 33-48,July, 2007.
  • T.F. Lee, M.Y. Cho, Y.J. Hsiau, “Optimization and Implementation of a Load Control Scheduler Using Relaxed Dynamic Programming for Large Air Conditioner Loads”, IEEE Transaction on Power System, Vol. 23, No.2, May, 2008, pp.691-701.
  • 卓明遠,黃鐘慶,陳朝順,,李正峰,李秉正,黃佳文,“本公司配電系統中期負載預測模式研究”,台電工程月刊,Vol. 730, pp. 71-92,June, 2009.
  • 卓明遠,藍榮進,張文曜等,“輸電線路航空障礙燈及蓄電池壽命遙測監控系統技術之研究與建立”,台電工程月刊,Vol. 737, pp. 28-44,J an., 2010.

<會議發表>

  • Cho M.Y., Hwang H.S., Chen C.S., Lin W.M., 1989, "The Design of Database for Distribution Automation", Proceeding of the 10th Symposium on Electrical Power Engineering, ROC, pp. 184-199.
  • Cho M.Y., Chen C.S., Lu C.N., 1991, "The Application of Performance Index for Distribution Network Loss Reduction and Load Balance", Proceeding of the 12th Symposium on Electrical Power Engineering, ROC, pp. 381-387.
  • Cho M.Y., Lee T.E., Chen C.S., 1992, "Distribution System Energy Loss Reduction By Critical Switches", Proceeding of the 13th Symposium on Electrical Power Engineering, ROC, pp. 618-625.
  • Cho M.Y., Lee T.E., Chen C.S., Lu C.N., 1992, "A New Approach for Feeder Reconfiguration to Minimize Distribution System Loss", Joint International Power Conference, Greece, pp. 596-600.
  • 卓明遠, 周惠民, 1994, "配電系統精確饋線損失計算", 第九屆技職教育研討會工業類(II), pp.81-88.
  • Kau S. W., Cho M.Y., 1995, "Distribution Feeder Loss Computation By Artificial Neural Network", IEEE IAS I&CPS Technical Conference pp.73-78.
  • Cho M.Y., Hwang J.C., Chen C.S., 1995, "Customer Short-term Load Forecasting By Using ARIMA Transfer Function Model", EMPD International Conference.
  • Cho M.Y., Chen C.S., 1995, "Distribution Feeder Reactive Power Compensation By Shunt Capacitor", Stockholm Power Tech. SPT PS 24-04-0148.
  • 卓明遠,康渼松,曾燕明,曾本立,1995, "配電饋線實際電容器規劃與損失分析系統之研究", 中華民國第十六屆電力研討會.
  • 黃鐘慶,曾燕明,卓明遠,劉志放,黃佳文,蔡江林,張淑華, "用戶端 ARIMA 轉移函數模型於短期負載之應用", 中華民國第十六屆電力研討會.
  • 卓明遠,葛世偉,陳建男,張謙信,黃豐乾,”The Implementation of Supervisory Control and Data Acquisition System As Teaching Tool for Power System Practice,” 中華民國第十七屆電力研討會
  • M.Y. Cho, J.C. Hwang, “Development of Data Acquisition and Load Control System By Programming Logic Controller for High Voltage Load Customer”,1998 International Conference on Power System Technology,Beijing, China, pp.275-279.
  • 卓明遠,黃鍾慶,葛世偉,1998,“PC級電能管理系統於高壓用戶負載管理之應用”,第19屆電力工程研討會論文集.ROC,pp.338~342.
  • 卓明遠,黃佳文,1999,“PC級電能管理系統於能源節約之應用”,88年節約能源論文發表會,pp.141~pp.160.
  • 康渼松,黃坤元,陳朝順,黃昭明,卓明遠,1999,“模糊動態規劃法求解需量預約服務之負載控制量”,第20屆電力工程研討會論文集,ROC,pp.1172~1175.
  • 卓明遠,黃文良,楊昇帆,陳謄文,1999,“模糊化配電饋線重組策略之發展”,第20屆電力工程研討會論文集,ROC,pp.837~842.
  • 卓明遠,藍榮進,林哲雄,黃佳文,1999,“高壓用戶需量控制器原型之研製”,第20屆電力工程研討會論文集,ROC,pp.862~866.
  • 卓明遠,陳建男,張謙信,林哲雄,黃佳文,2000,“互通式控制網路為基礎之需量預約服務控制系統”,第21屆電力工程研討會論文集, ROC.
  • 卓明遠,陳建男,張謙信,林哲雄,黃佳文,2000,“電力線載波型,無線電射頻型需量預約服務控制器測試與分析”,第21屆電力工程研討會論文集, ROC.
  • M. Y. Cho, C. W. Huang, May, 2001, “Development of Microprocessor Based Demand Control System for Industrial and Commercial Customer”, IEEE IAS ICPS-01, LA. USA.
  • M. Y. Cho, S. W. Gau, C. W. Huang, May, 2001, “Development of PC based Energy Management System for Electrical Energy Saving of High Voltage Customer”, IEEE IAS ICPS-02, LA. USA.
  • 卓明遠, 黃佳文, 2001,“電力線載波型,無線電射頻型需量預約服務控制器設計與測試”,九十年節約能源論文發表會論文集,台灣電力公司,pp.232~ 246
  • 藍榮進,卓明遠,黃文良,黃佳文,陳裕清,2001, ”以GSM無線通信為基礎之需求面管理負載控制器原型”,第22屆電力工程研討會論文集, ROC. pp. 824~828.
  • 余思漢,李建興,卓明遠,2001, ”以誤差倒傳遞法計算台灣地區落雷日數”, 第22屆電力工程研討會論文集, ROC. pp. 1695~1698.
  • 黃文良,卓明遠,黃文祥,2001, ”設計WWW網頁融入傳統電力相關課程教學方法之研究”, 第22屆電力工程研討會論文集, ROC. pp. 1760~1764.
  • 藍榮進,卓明遠,黃佳文,楊新全,2002, ”具及時資料傳輸功能之P,Q型電能轉換器研製”,第23屆電力工程研討會論文集, ROC. pp. .
  • 卓明遠,藍榮進,王錦榮,葛世偉,黃佳文,楊新全,彭士開,2003, ” PLC/RF型需量預約服務控制器性能提升與實現”,第24屆電力工程研討會論文集, ROC. pp. 287-291.
  • 卓明遠,陳建男,林子喬,黃佳文,楊新全,彭士開,2003, ” 型需量預約服務控制系統於用戶電能管理系統與分析”,第24屆電力工程研討會論文集, ROC. pp. 292-296.
  • 卓明遠,林子喬,2004,” 距電驛之故障距離偵測與敏感度分析”, 第25屆電力工程研討會論文集, ROC. pp. 134-139.
  • 卓明遠,林子喬,2004,”以FPGA為基礎之數位式 距電驛設計與分析”, 第25屆電力工程研討會論文集, ROC. pp. 1499-1504.
  • Ming Yuan Cho, Tsair Fwu Lee, and Tzu Chiao Lin,”Fault Location Estimation Algorithm of Distance Relay By Considering Sensitivity Analysis,” ICSS proceeding, I SOU university,2005
  • 卓明遠,葛世偉,藍榮進,王錦榮,黃佳文,楊新全,陳裕清,彭士開,2005” 特高壓用戶電能控制與管理系統運轉成效分析”,台電節約能源研討會,即將發表。
  • Ming Yuan Cho, Tsair Fwu Lee, Chin Jung Wang, etc. "Development fault diagnosis systems of power transformer based on data acquisition module from GSM and Multi-layer SVM classifier", 2005, The 26th Symposium on Electrical Power Engineering, Jung-Li, Taiwan, 9~10 December, 2005.
  • Ming-Yuan Cho, Tsair-Fwu Lee, and Tzu-Chiao Lin, etc. "Fault Location Estimation Algorithm of Distance Relay by Considering Sensitivity Analysis" , pp.27-32, IEEE ICSS2005, April 28-29, 2005, Kaohsiung, Taiwan..
  • 楊新全,黃佳文,陳裕清,彭士開,卓明遠,李鴻仁,黃鐘慶,” 以需求面管理為主之資料倉儲系統應用”,台電節約能源研討會,pp. 165-177,2006。
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh and Fu-Min Fang."Particle Swarm Optimization-Based SVM Application: Power Transformers Incipient Fault Syndrome Diagnosis ", 2006 International Conference on Hybrid Information Technology, Cheju Island, Korea. ICHIT 2006, November 9th ~11th 2006.
  • Ming-Yuan Cho, Tsair-Fwu Lee, Hong-Jen Lee."An Embedded Methodology for FPGAs’ Digital Distance Relay Design and Analysis ", 2006 International Conference on Hybrid Information Technology, Cheju Island, Korea. ICHIT 2006, November 9th ~11th 2006.
  • Tsair-Fwu Lee, Ming-Yuan Cho, Fu-Min Fang. "Features Selection of SVM and ANN Using Particle Swarm Optimization for Power Transformers Incipient Fault Symptom Diagnosis", ICONIP2006, 13th International Conference on Neural Information Processing, Hong Kong, October 3--6, 2006.
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh, Hong-Jen Lee, Fu-Min Fang. "Particle Swarm Optimization-Based SVM/ANN for Incipient Faults Classification of Power Transformers", ISMIS2006, The 16th International Symposium on Methodologies for Intelligent Systems, Bari, September 27-29, 2006.
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh, Hong-Jen Lee, Fu-Min Fang. "Diagnosis of Incipient Faults of Power Transformers Using SVM with Clonal Selection Algorithms Optimization", ISMIS2006, The 16th International Symposium on Methodologies for Intelligent Systems, Bari, September 27-29, 2006.
  • Ming-Yuan Cho, Tsair-Fwu Lee, Shih-Wei Kau, etc. "Power Transformer Fault Diagnosis Using Support Vector Machines and Artificial Neural Networks with Clonal Selection Algorithms Optimization", KES2006 10th International Conference on Knowledge-Based & Intelligent Information & Engineering Systems, Bournemouth International Conference Centre 9, 10 and 11 October 2006.
  • Tsair-Fwu Lee, Pei-Ju Chao, Fu-Min Fang, etc. "Intensity Modulated Radiotherapy Target Volume Definition by means of Wavelet Segmentation", KES2006 10th International Conference on Knowledge-Based & Intelligent Information & Engineering Systems, Bournemouth International Conference Centre 9, 10 and 11 October 2006.
  • Ming-Yuan Cho, Tsair-Fwu Lee, Shih-Wei Kau, etc. "Fault Diagnosis of Power Transformers Using SVM/ANN with Clonal Selection Algorithm for Features and Kernel Parameters Selection", 2006 International Conference on Innovative Computing, Information and Control, ICICIC2006 August 30 - September 1, 2006, Beijing.
  • Ming Yuan Cho, Tsair Fwu Lee, Chien Nan Chen, etc. "The Development And Implementation Of Optimum Load Control Strategy Of Air Conditioner Based High Voltage Customers", 2006 International Conference on Innovative Computing, Information and Control, ICICIC2006 August 30 - September 1, 2006, Beijing.
  • Ming-Yuan Cho and Tsair-Fwu Lee."High Voltage Customers Air Conditioner Optimal Load Control Strategy Using Dynamic Programming Algorithm ", Proceedings of 2006 CACS Automatic Control Conference St. John's University, Tamsui, Taiwan, Nov. 10-11, 2006.
  • Ming-Yuan Cho and Tsair-Fwu Lee."A Methodology of Design and Analysis: For Digital Distance Relay Embedded on FPGAs ", Proceedings of 2006 CACS Automatic Control Conference St. John's University, Tamsui, Taiwan, Nov. 10-11, 2006.
  • Tsair-Fwu Lee, Ming-Yuan Cho, Chin-Shiuh Shieh, Fu-Min Fang. "Fault Syndrome Diagnosis of Power Transformers Using Particle Swarm Optimization-Based SVM ", FSTTCS 2006, The 26th Conference on Foundations of Software Technology and Theoretical Computer Science, Indian statistical institute Kolkata, India, December 13-15, 2006.
  • T.F. Lee, H. Y. Wu, Y.C. Hsiau, T.L. Huang, M.Y. Cho, “Relaxed Dynamic Programming for Constrainted Economic Direct Load Control”, 14th International Conference on Intelligent System Application to Power Systems Proceeding, pp. 650-655, 2007.
  • T.F. Lee, Y.C. Hsiau, H. Y. Wu, T.L. Huang, M.Y. Cho, “Optimization of Reactive Power Compensation and Voltage Regulation Using Artificial Immune Algorithm for Radial Transmission Networks”, 14th International Conference on Intelligent System Application to Power Systems Proceeding, pp. 632-637, 2007.
  • 卓明遠,蕭盈璋,周育賜, “以微處理機為基礎之電能監控管理系統設計與實現”, 第28屆電力工程研討會論文集, ROC. pp. E2.3-1~5, 2007.
  • 卓明遠,杜耿邦,周育賜, “高壓契約用戶之電能管理系統設計與實現”, 第29屆電力工程研討會論文集, ROC. pp. 325-329, 2008.
  • 卓明遠,杜耿邦,周育賜,“考量負載控制策略之最適契約容量規劃”, 第29屆電力工程研討會論文集, ROC. pp. 336-340, 2008.
  • 卓明遠,杜耿邦,吳美岑,“應用類神經網路於風力機組風速與發電量預測”, 第29屆電力工程研討會論文集, ROC. pp. 52-56, 2008.
  • 蕭盈璋、林律安,卓明遠,王念中,黃佳文,“配電系統中期負載預測之研究”, 第29屆電力工程研討會論文集, ROC. pp.944-948, 2008.
  • 卓明遠,陳子敬,“應用深埋電極法改善屋內型變電所接地電阻之研究”, 第29屆電力工程研討會論文集, ROC. pp. 1336-1340, 2008.
  • 卓明遠,蕭勝文,蕭勝任,“超高壓地下電纜被覆耐雷擊特性模擬與分析”, 第29屆電力工程研討會論文集, ROC. pp. , 2008.
  • 卓明遠,杜耿邦,趙億裕,“風力發電系統遠端監控平台設計與實現”, 第29屆電力工程研討會論文集, ROC. pp. 2047-2051, 2008.
  • 卓明遠,李俊賢,“支撐向量機分類器於養殖型用戶違章用電之應用”, 第29屆電力工程研討會論文集, ROC. pp. , 2008.
  • 卓明遠,杜耿邦,周育賜,黃佳文,張文曜,王念中,”考慮舒適度之經濟型高壓用戶電能管理系統研製與節能應用”,台電節約能源研討會,pp. 328-346,2009。
  • 卓明遠,杜耿邦,周育賜,黃佳文,張文曜,王念中,” 考量負載控制策略之最適契約容量規劃與節能應用”,台電節約能源研討會,pp. 347-358,2009。
  • 卓明遠,蕭勝文,李俊賢,黃佳文,陳裕清,王念中,”以支撐向量機分類器降低養殖型用戶非技術性損失”,台電節約能源研討會,pp. 359-378,2009。
  • 卓明遠,李建興,吳美岑,”風力機組風速與發電量預測模式與資訊平台建立”,台電節約能源研討會,pp. 512-525,2009。
  • 卓明遠,李明澤,“螺旋式冰水主機變頻控制與節能應用”, 第30屆電力工程研討會論文集, ROC. pp. -, 2009.

<技術報告及其他論文等> 專書及專書論文

  • 1. Cho M.Y., 1992, "Determination of Critical Switches for Loss Minimization of Distribution System", Ph.D. Dissertation, The National Sun Yat-Sen University.
  • 2. Cho M.Y., 1989, "The Application of Database for Distribution System Analysis", Thesis of Master Degree, The National Sun Yat-Sen University.
  • 3. Chen C.S., Lu C.N., Yan Y.H., Cho M.Y., Lee C.R., 1991, "Planning of Distribution Automation System", Final Report, Taiwan Power Company.
  • 4. 李清吟,卓明遠,陳鴻誠,李俊良譯,2001, “電力系統分析”,東華書局,第一版.

<技術報告及其他>

  • Chen C.S., Moo C.S., Wu J.S., Cho M.Y., Hwang H.S., 1989, "The Design of Database for Distribution Automation", Final Repoert, Natonal Science Council.
  • Chen C.S., Moo C.S., Yan Y.H., Cho M.Y., Lee C.R., 1991, "Determination of Critical Switches in Distribution System", Final Report, National Science Council.
  • Chen C.S., Moo C.S., Cho M.Y., Chou W.M., Yan M.J., 1992, "Analysis of Distribution System Loss", Final Report, Taiwan Power Company.
  • Cho M.Y., Hwang W.L., 1994, "A Study of Feeder Reconfiguration to Reduce Distribution System Loss", Final Report, National Science Council.
  • Moo C.S., Wu J.S., Cho M.Y., 1994, "A Study of Distribution System Reactive Power Control and Practical Feeder Losses Analysis", Mid.-term Report, Taiwan Power Company.
  • Moo C.S., Wu J.S., Cho M.Y., 1995, "A Study of Distribution System Reactive Power Control and Practical Feeder Losses Analysis", Final Report, Taiwan Power Company.
  • 卓明遠, 陳朝順, 1997,“饋線轉供對電容器規劃影響之研究”, 國科會期末報告.
  • 卓明遠, 1998,“模糊控制於饋線自動化協調操作策略應用之研究”, 國科會電力產科計畫期末報告.
  • 卓明遠, 黃文良, 1999,“PC級電能管理系統於需求面管理負載控制應用之研究”, 國科會電力產科計畫期末報告.
  • 黃鍾慶, 卓明遠, 1999,“玻璃陶瓷業用電特色對負載管理策略影響之研究”, 台電業務處研究計畫期末報告.
  • 卓明遠,藍榮進,陳建男,張謙信,2000,”需量預約服務控制系統設計與研製”,台電電力研究所負載室計劃期末報告.
  • 卓明遠,葛世偉,藍榮進, 2000,”GSM無線型需求面負載管理控制器設計與研製”,國科會電力產科計畫期末報告.
  • 卓明遠,葛世偉,2001, ”多功能電力線載波形節能控制器原型之研製”,國科會簡要報告 NSC 89-2212-E-151-033.
  • 卓明遠,藍榮進,2001, ”高雄市高中高職學校節能系統示範研究-以海青工商左營高中為例”,期末報告.
  • 卓明遠,藍榮進,陳建男,彭士開,黃佳文, 2002, “需量預約服務控制系統性能改善與示範研究”, 台電計畫期末報告.
  • 卓明遠,藍榮進,陳建男,彭士開,黃佳文, 楊新全,2003, “特高壓用戶電能管理與服務系統建構研究”, 台電計劃期末報告.
  • 卓明遠,黃鐘慶,詹益亮,楊光漢,2003,“鋼鐵業與化工業非百大能源查核輔導服務”,工研院能資所,期末報告。
  • 卓明遠,葛世偉,林子喬,曾士耿,2003,“鋼筋製程e化與遠端監控”,育華興業,第一次期中報告。
  • 卓明遠,葛世偉,林子喬,曾士耿,2003,“鋼筋製程e化與遠端監控”,育華興業,第二次期中報告。
  • 卓明遠,葛世偉,林子喬,曾士耿,2003,“鋼筋製程e化與遠端監控”,育華興業,期末報告。
  • 卓明遠,藍榮進,陳建男,黃佳文, 陳裕清,楊海鵬,2004, “WEB based 高低壓用戶最適契約容量分析與管理軟體發展”, 台電計劃期中報告.
  • 卓明遠,李鴻仁,藍榮進,黃佳文,陳裕清,楊海鵬,2004, “WEB based 高低壓用戶最適契約容量分析與管理軟體發展”, 台電計劃期末報告。
  • 卓明遠,黃鐘慶,黃佳文,楊新全,2004,“用戶服務資料倉儲系統規劃與設計”, 台電計劃期中報告。
  • 卓明遠,黃鐘慶,黃佳文,楊新全,2005,“用戶服務資料倉儲系統規劃與設計”, 台電計劃期末報告。
  • 卓明遠,藍榮進,黃佳文,楊新全,2006,“低壓用戶違章用電監測系統建置”, 台電計劃期中報告。
  • 卓明遠,藍榮進,黃佳文,楊新全,2006,“低壓用戶違章用電監測系統建置”, 台電計劃期末報告。
  • 卓明遠,黃鐘慶,陳朝順,,李正峰,李秉正,黃佳文,2007,“本公司配電系統中期負載預測模式研究”, 台電計劃期中報告。
  • 卓明遠,黃鐘慶,陳朝順,,李正峰,李秉正,黃佳文,2008,“本公司配電系統中期負載預測模式研究”, 台電計劃期末報告。
  • 卓明遠,葛世偉,藍榮進,林蒼喬,2008,“電子式電表耐後性試驗與使用壽命分析”, 台電計劃期中報告。
  • 卓明遠,葛世偉,藍榮進,林蒼喬,2008,“電子式電表耐後性試驗與使用壽命分析”, 台電計劃期末報告。
  • 卓明遠,藍榮進,張文曜,2008,“輸電線路航空障礙燈及蓄電池壽命遙測監控系統技術之研究與建立”, 台電計劃期中報告。
  • 卓明遠,藍榮進,張文曜,2009,“輸電線路航空障礙燈及蓄電池壽命遙測監控系統技術之研究與建立”, 台電計劃期末報告。
  • 卓明遠,鞏天發,2008,“九十六年度節能計畫與評估路燈管線併入寬頻管道可行性計畫等2項計畫”, 高雄市工務局養工處計劃期末報告。
  • 卓明遠,李鴻仁,黃佳文,2009,“開發WEB BASED減少用電措施月報資料統計系統”, 台電計劃期中報告。